Type Cabin |
CA-01 |
Built in Year |
2014 |
Project Name |
Industrial Pars Shoes |
Main Specification |
Floor |
Lattice Steel |
Ceiling |
Steel Powder |
Car Wall |
Steel Powder – Painting – 20mm |
Operation Box |
Special for Industry |
Capacity |
3000 kg |
Description |
System Hydraulic in direct – Ladder & Door in Ceiling for Service |
|
|
Type Cabin |
CA-03 |
Built in Year |
2011 |
Project Name |
Hypermarket Ekbatan – Tehran |
Main Specification |
Floor |
Stone |
Ceiling |
Hairline Finished Stainless Steel, PLEKSI |
Car Wall |
Hairline Stainless Steel |
Operation Box |
Hairline Stainless Steel, H 2m |
Capacity |
2000 kg |
Description |
System Hydraulic in direct |
|
|
Type Cabin |
CA-02 |
Built in Year |
2011 |
Project Name |
International Airport Imam Khomeini - CIP |
Main Specification |
Floor |
Natural Stone |
Ceiling |
Hairline Stainless Steel |
Car Wall |
Hairline Stainless Steel, Mirror Steel |
Operation Box |
Hairline Steel, H 2m |
Capacity |
16 Per |
Description |
System MR 2/1 |
|
|
Type Cabin |
CA-04 |
Built in Year |
2010 |
Project Name |
KANDI Hospital – Tehran |
Main Specification |
Floor |
PVC |
Ceiling |
Hairline Stainless Steel |
Car Wall |
Hairline Stainless Steel |
Operation Box |
Hairline Steel, H 1.60m |
Capacity |
Bed Car |
Description |
System MR 2/1 |
|
|
|
|
|